Derbyshire Relocation Project

Due to re-location of a packaging supplies company in Derbyshire, PD industrial was awarded the order to provide the following:

  • 2 x Mezzanine floor areas each 28,500mm x 6,600mm used for storage of materials
  • 1 x Block of six offices and reception area complete with a trade serving hatch and toilet area, all constructed using powder coated steel partitioning.
  • 1 x Block of canteen/rest area complete with a toilet block and locker area, all constructed using powder coated steel partitioning.
  • 1 x Run of 16 bays of pallet racking with column guard protection.

The customer was extremely pleased with the end product and has since commented that his production levels have increased as a result of a more suitable building and layout.

Before

Derbyshire Project Before

After

Derbyshire Project Completed