Warehouse Racking Removal Project

Pallet racking removal from a closing site is often the last job to be considered.

This recent racking strip out was carried out with just three days’ notice from the client and with a deadline of four days to completely remove the pallet racking from site.

PD Industrial dismantled the installation at no charge and gave the client a rebate for the pallet racking too – a real relief to the client who had been let down by another company on this project.

Our contracts manager was on site to handle all health and safety controls along with our racking team to ensure a smooth process in handing the site back to the client.

Picture 071

Click image for enlargement